How Can We Help?

Frequently Asked Questions

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

Observation: Gaps show in exterior trim.

Performance Standard: Joints between exterior trim elements, including siding and masonry, shall not result in joints opened wider than 3/8 inch. In all cases the exterior trim shall perform its function of excluding the elements.

Corrective Measure: The remodeler will repair open joints that exceed the performance standard. Caulking is acceptable.