Performance Standard: Counter tops shall be free of cracks and chips at the time the job is accepted. Cracks or chips occurring after acceptance of the job are the owner’s responsibility.
Corrective Measure: The remodeler will replace cracked or chipped counter tops only if they are reported prior to acceptance of the job.